  • 5 - design life - 25 years
  • 4 - maximum per day load in the summer season up to 120t / 24h;
  • 3 - the average annual volume of 71.68 t / 24h;
  • 2 - project capacity 502 444 tons;
  • 1 - located on the area 124.129

Energy object

In Sozopol, the first of its kind "Energy facility for the production of electrical energy from renewable energy sources

The project of 6 megawatt per hour will be completed in March 2019

                                                                                                                                                                                                                                                                     -

Since 2015 (on a technically equipped test site), the first stage of the first project in Sozopol (plastic sorting and processing line) has been completed

2 years prior to the preparation and production of energy equipment, sorting and analysis of raw materials were carried out

.

С                2015 (on a technically equipped landfill) completed the first stage of the first project in Sozopol (plastic sorting and processing line)

2 years prior to the preparation and production of energy equipment, sorting was carried out to determine the morphological composition of MSW.

Project completion will provide both economic benefits and a long-term environmental impact. The arriving waste at the Regional Landfill of Sozopol serving and, Tsarevo and Primorsko, will be completely recycled at the plant, This will lead to the extension of the life of the landfill for solid waste, and almost makes it eternal.

.

.